Thursday 7 March 2013

Week 18 Tiles, Finishes and Rendering

Week Eighteen 4 - 8 Feb

Day 85 - 89.  More tiling this week, this time it was the ensuite.  The tiles will look great and they have been done just how I wanted.  I must admit I never thought to ask about the grout colours so the wall tiles have white grout in them and the floor tiles a grey.  The grey blends in with the floor tiles and whilst I would not have picked it the white in the wall tiles actually works and serves to match in with the white sink and will also match when the window and door surrounds are painted as they will be white too.


Finishing.  All the surrounds for the windows and doors have been finished now and the door between the ensuite and WIR installed.  The window into the powder room will be of frosted glass which will match the screen that will be in the entry to hide the powderroom door.

The plasterers have been in doing all the patching up on the walls to prepare them for painting and finishing off a couple of bits of cornice.


The missing tiles in the kitchen have also been installed and I am really pleased with the finish.

There has been a lot of work on the outside too.  The front brickwork has been rendered and the plasterboard and finishes under the eaves are being installed.

No comments:

Post a Comment